What time does MRT end?
What time does MRT end?
Train Operation Hours and Frequency 5.30am to around midnight daily. Operating hours are usually extended during festive periods.
What time is the last train for East West Line?
towards EW1 Pasir Ris
First Train | Last Train | |
---|---|---|
Friday | 05:29 | 23:29 |
Saturday | 05:29 | 23:29 |
Sunday | 05:59 | 23:29 |
Public Holidays | 05:59 | 23:29 |
What time is the last train Circle Line?
CIRCLE LINE Timetable and Stops The CIRCLE LINE metro (to ⑧ Dhoby Ghaut) has 28 stations departing from Harbourfront (NE1|CC29) and ending in Dhoby Ghaut (NS24|NE6|CC1). CIRCLE LINE metro timetable overview: Normally starts operating at 05:30 and ends at 23:03. Normal operating days: everyday.
What time is the last MRT Downtown Line?
Downtown Line – (DT17) Downtown | ||
---|---|---|
Destination | First Train | Last Train |
Weekdays & Sat | Daily | |
DT1 Bukit Panjang | 6:13am | 12:16am |
DT35 Expo | 6:04am | 12:06am |
How long can you stay in MRT station?
Is there a time limit for MRT/LRT travel? Yes, the maximum time allowed is 120 minutes.
How long is a MRT train?
Mass Rapid Transit (Singapore)
Overview | |
---|---|
Train length | 3–6 carriages |
Headway | Peak: 1–3 minutes Off-peak: 5 minutes |
Technical | |
System length | 216 km (134 mi) |
When did MRT start in Singapore?
November 7, 1987
Mass Rapid Transit/Began operations
Does MRT operate today?
MRT 3 operates from Monday to Sunday during the GCQ. The first trip from both North Avenue and Taft Avenue is at 5:30 AM. The last trip from the north is at 9:10 PM, while the last trip from Taft is at 10:11 PM.
What time is the last MRT Harbourfront?
First/Last train service terminating at CC29 HarbourFront
First Train | Last Train | |
---|---|---|
Friday | 05:23 | 23:18 |
Saturday | 05:23 | 23:18 |
Sunday | 05:47 | 23:18 |
Public Holidays | 05:47 | 23:18 |
Is downtown line open?
The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground….Downtown MRT line.
Downtown Line | |
---|---|
History | |
Planned opening | 2024 (Stage 3e) 2025 (Hume) mid-2030s (Stage 2 extension) |
Opened | 22 December 2013 (Stage 1) 27 December 2015 (Stage 2) 21 October 2017 (Stage 3) |
Technical |
How long is MRT train?
Where is the MRT station in Choa Chu Kang?
Choa Chu Kang MRT/LRT Station (NS4/BP1) is an interchange station along the North South Line (NSL), as well as the terminus of the Bukit Panjang LRT (BPLRT). Located within the Choa Chu Kang Central planning subzone, the station is overground station and located just off Choa Chu Kang Avenue 4.
Is there a train from Choa Chu Kang to Yishun?
The journey, including transfers, takes approximately 1h 3m. Is there a direct train between Choa Chu Kang MRT/LRT Station and Yishun MRT Station? Yes, there is a direct train departing from Choa Chu Kang and arriving at Yishun. Services depart every five minutes. The journey takes approximately 29 min.
Who was killed at Choa Chu Kang train station?
On 7 April 2008, a man was hit by a train at Choa Chu Kang station at 8 am, resulting in the disruption of northbound train services from Yew Tee to Bukit Gombak for about 50 minutes. He was subsequently pronounced dead by paramedics.
How did Choa Chu Kang get its name?
Choa Chu Kang originally referred to the former Chua Chu Kang Village near the National Shooting Centre today. The name was used main arterial road heading eastbound towards Upper Bukit Timah Road, and later began to be applied to developments surrounding this arterial road where Choa Chu Kang New Town stands today.